Lighting Up Timing

We have thus planned the electronic lighting in the production department on the basis of three points: times, external light, areas of warehouse.
A simple planning of these three elements allows us to light the occupied areas in the best possible way, at the same time avoiding wasting energy in the empty areas ( where sufficient lighting must be given in any case).
